CLIMAMEISTER
0

Applications

Per situation: what to watch out for, and which range fits.

Construction site

Construction site

On site the heat has to arrive fast without getting in the way of the work. Insulation is often missing and sometimes so is mains power.

Industry and storage

Industry and storage

Large volumes, high ceilings and machines giving off heat of their own. Air movement matters as much as heat here.

Events

Events

Marquees and temporary venues: visitor comfort, low noise and a short build-up time.

Hospitality and terrace

Hospitality and terrace

Heated terraces and temporary extensions: targeted warmth without noise or draught across the tables.

Renovation and drying out

Renovation and drying out

After water damage, with new-build moisture or before laying floors, the moisture has to go before work continues.